Barman Sazeh co. has been registered in 1992 under management of Mr. Barat Parsapour in order to be active in the fields of civil jobs like Installations and equipment regarding to water and waste water pipelines, oil and gas and telecommunication, electricity distribution and transmission lines, Electricity substations maintenance, watering and drainage and land leveling, building dams, Tunnels, runways and main roads.
This company at the moment has acquired grade 1 in water projects, grade 3 in roads and runways, grade 4 in installation and equipment and grade 5 in buildings, oil and gas
The company is striving to provide high-tech, experienced personnel, knowledge and technology of the day, equipped with heavy machinery and many experience due to its successful participation and high participation in construction projects. By expanding its activities, it will take an important step towards the development and development of the country.
Barman Sazeh co. to be active in the fields of civil jobs like Installations and equipment regarding to water and waste water pipelines, oil and gas and telecommunication, electricity distribution and transmission lines, Electricity substations maintenance, watering and drainage and land leveling, building dams, Tunnels, runways and main roads
Construction of the main and the secondary irrigation network under the pressure of the Emarat dams riffle,the Boran district includes : pipe-laying operations and the GRP pipes with the diameter of 600 to 1600 mm and a length of about 37 km, polyethylene pipes-laying with
procurement , transportation of all pipes and joints, materials of the project, construction of 517 km pipeline ,service road between the farms for 86 km,buildings for 300 square meter,construction of a warehouse for 600 meter, concrete basin for 1100 cubic meter.
performing hte irrigation and drainage system of ghasre shirin region 3 and 4 including installation, test and completion of pipes and its structurs, construction of irrigation and drainage channels and its buildings, service road of 50 km,lining channel for 10 km
Construction of operation building for 200 square meter , pumping station for 300 square meter , and transformer building for 50 sq meter along with mechanical and electrical installations and piping with poly ethylene and steel pipes of 50 to 550 mm for 538000 meter
Our portfolio shows our hard work and devotion to helping our clients succeed. Dont just take our word for it. Check out the latest work.